[1997] Rolling mill of Incheon ironworks (Impedence test), Haeundae-gu…
페이지 정보
본문
1997.01-07
- Non-destructive inspection of the 3th Daelim APT in Haeundae New Town Area
- Precision safety diagnosis and measuring control of Jindo bridge
- Precision safety diagnosis of the number 30 national highway Sannae bridge
- Periodic inspection of the fishery joint market in Sungsanpo, Jeju-do
- Sonic coring test of connecting road pile of Baegyangsan tunnel
- Structure Precision safety inspection of Han River passing area on 5-42 section
1997.08-09
- Precision safety diagnosis service of Jangrim sewer
- Precision safety diagnosis service of the 3th Beom bridge
- Execution design and precision safety diagnosis of BeomCheon Gwaseon footway bridge
- Viaduct Precision safety diagnosis of road facilities of Dongnae ward office in Busan
- Safety inspection of Yangsan Seokgye bridge (Commission company : Licoba Industrial Co., Ltd.)
1997.10
- 3 building's precision safety diagnosis of Daedong general construction
- Repair work of 4 numbers of bridge including Namsan bridge
- Daewoo (co) Gwangan 5th section field - soundness of cast-in-place pile
1997.11
- Precision safety diagnosis service of the 2nd Gangdong bridge including the other bridge
- Field foundation P.C pile impedance test of Jinyeoung Dong Pusan APT Gyeongsangnam-do
- The 2nd field's pile impedance test of Suyeong construction connecting load
- Steel bridge manufacture inspection of the access bridge of Yangsan terminal
- Cast-in-place pile simbat test and sonic coring test of the composition goods terminal access bridge in Yangsan & sonic coring test
- Cast-in-place pile sonic coring test and impedance test of new airport Yeonyuk bridge in Yeongjongdo, Incheon
1997.12
- Safety diagnosis and foundational impedance test of a district public prosecutors office in Ulsan
- Trade center safety inspection of Suyeong port
- Building safety inspection of constructive field of Hapo bridge on Gwangyang port
- Structure safety diagnosis of Haeundae-gu office and Jaesong 1-Dong
- Safety inspection of 29 bridge including Goyang bridge in Seosan city, Chungcheongnam-do
- Foundational P.C pile seismic parallel test of the rolling mill of Incheon ironworks, Incheon
- Pile work impedance test of Gwangan bridge construction foundation
- 87 bridges inspectioning and computer treatment of Miryang in Gyeongsangnam-do
- Complement· reinforcement work of Yeongdo bridge in Busan
- 이전글[1998] Seonbawi bridge (Bridge & Tunnel), Busan port (Harbor), etc. 20.11.18
- 다음글[1996] Pukyung National Univ (Construction), Busan bridge (Impedence test), etc. 20.11.18
댓글목록
등록된 댓글이 없습니다.