[2001] Gamman bridge (Bridge & Tunnel), Kyungdong APT (Construction), …
페이지 정보
본문
Safety inspection (Construction)
- Safety inspection after and before making building
- Construction safety inspection of transmitting tower of PSB
Physical exploration (seismic) field
- Precision safety diagnosis of Dongcheon bridge
- Foundation inspection of viaduct at Hopo (2001. 6)
- Foundation inspection of Dongcheon bridge and Gamman bridge (2001. 6)
- Submarine inspection service of bridge foundation in 2002 (2001. 7)
- Precision inspection service of breakwater at Okgye harbor (2001. 10)
- Precision inspection service of harbor structure at jeju area (2001. 10)
- Precision inspection service of four including retaining wall of Oseong apt. (2001. 10)
- Construction safety inspection service of subway 305 section (2001. 11)
Precision safety diagnosis (Construction)
- Defect inspection and Precision inspection of Lotte second APT at Haeundae (2001.01)
- Defect inspection and Precision inspection of Sangnok APT at Haeundae (2001.02)
- Defect inspection and Precision inspection of Daewoo APT at Haeundae (2001.02)
- Defect inspection and Precision inspection of Samhwan APT at Haeundae (2001.03)
- Defect inspection and Precision inspection of Daun APT in Ulsan
- Defect safety diagnosis and Precision inspection of Daewon APT at Haeundae (2001. 05)
- Defect safety diagnosis and Precision inspection of Green second APT at Daewoo (2001.05)
- Precision inspection service of Kyungdong APT at Yungho-dong (2001. 05)
- Precision inspection and defect safety diagnosis of Sungwon Beach APT at Dadae (2001. 06)
- Precision inspection and defect safety diagnosis of Dongbu Olympic Town (2001. 06)
- Existing state inspection of construction around's 8 houses at Buwon post office in Gimhae (2001. 10)
- Safety inspection, measuring management and existing state inspection of construction around's 6 houses at Hadan-dong 529-13 (2001. 10)
Construction safety inspection
- Construction safety inspection of 307 section at Busan subway (1999 ~ 2001)
- Construction safety inspection of 305 section at Busan subway (1999 ~ 2001)
- Construction safety inspection of the garbage's reclaimed land at Saenggok (1999 ~ 2001)
- Construction safety inspection of Myogok section at Lotte (1999 ~ 2001)
- Construction safety inspection of hill town at Munhyeon (2000 ~ 2001)
Measuring management of structure at a field of road construction of subway, tunnel and bridge
- Load test of well tube at Busan subway 311 section (1999 ~ 2001)
- Measuring management at Busan subway 311 section (1999 ~ 2001)
- Measuring management of Safe Square (2000~2001)
- Measuring management of road extending work and removal of Gupo viaduct (2000 ~ 2001)
Steel bridge work's inspection and supervision
- Extending and pavement work of road four land between Ulsan and Gangdong (2000 ~ 2001)
- Specification and test drawing up of welding part of steel pile (2000 ~ 2001)
- Steel bridge's making supervision between Sokcho and Shinsuro
- Steel bridge's making supervision of Ungcheon bridge at Busan New Port
Sonic coring test of cast in place concrete pile
- Sonic coring test of ring road at pier of Busan Port
- Sonic coring test of construction work (1 section) of dredge soil at Busan New Port
Impedance test and damage inspection test of ready made pile's depth
- Impedance test of extending and pavement work of four land between Saengnim and Samnangjin
- Impedance test of installation work of two section of ring road of at Busan harbor pier
- Impedance test of 311 section at Busan subway
- Impedance test of construction work at Busan New Harbor
Static and Dynamic loading test (Simbat test)
- Simbat test installation work of two section of ring road at Busan New Harbor's pier
- Simbat test and the other work of embankment field at Busan New Harbor
- Simbat test of cast in place pile at Busan subway 311 section (2001. 6)
Repair·Reinforcement work & Maintenance of all kinds of constructions
- Repair work at Suyeong temporary bridge
- Repair work of construction at Busan branch office of Lottesamkang
- Repair work of Yeonan Goaseon bridge
- Embarkment (1 section) and other work of dredge soil at Busan New Port
- 이전글[2002] Busanjin-gu Office (Construction), Busan port (Pile test), Busan port (Loding test), etc. 20.11.18
- 다음글[2000] Overpass at Gupo (Bridge & Tunnel), Kyongnam APT (Construction), Gwangyang factory (Repair·Reinforcement), etc. 20.11.18
댓글목록
등록된 댓글이 없습니다.