Main Performance

Misung C&S Inspection

Technical Service Performance

(Please Click on the title to see all the performance results for the year.)

[2002] Busanjin-gu Office (Construction), Busan port (Pile test), Busa…

페이지 정보

본문

Safety inspection (Construction)

 

- Precision inspection of Wonwoo APT at Sinpyeong-dong (2002. 02)

- Precision inspection of Hakjang second Samsung APT in Busan (2002. 02)

- Precision inspection service of Hyundai APT at Haeundae (2002. 05)

- Precision inspection of surrounding three buildings at model new work field (2002. 05)

- Precision inspection of Shinyangwon in Gimhae (2002. 08)

- Precision inspection of government office at Gijanggun office (2000. 08)

- Precision inspection of Samsung APT at Daeyeon-dong (2002. 09)

- Precision inspection service of Doosan second APT at Haeundae (2002. 09)

- Construction safety inspection three buildings around new work field at Yeongdo

 


Safety inspection (Harbor)

 

- Precision safety inspection of wharf at Okgye harbor (2002. 08)

 

 

Precision safety diagnosis (Bridge and Tunnel)

 

- Precision safety diagnosis service at Jaseong viaduct (2002. 09)


  

Precision safety diagnosis (Construction)

 

- Precision safety diagnosis of retaining wall at Goejeong field (2002. 10)

- Safety inspection of retaining wall at Yangsan MSC (2002. 03)

- Safety diagnosis of floor and steel frame of PET-2LINE at Botlring Co., Ltd in Yangsan's Coca Cola

 

 

Construction safety inspection


- Construction safety inspection into Hill tower field at Munhyeon-dong (2002. 06)

- Safety inspection of Yunsung tower field at Bujeon-dong (2002. 03)

- Safety inspection of new building field at Sepa world's 1020 in Ulsan

 


Measuring management of construction of subway, tunnel, bridge and road's working field

 

- Long term measuring service of front inspectioning and excavation between Daejeo and Gupo at Busan subway line 3 (1999. 06 ~ 2003. 08)

 

 

Inspection and supervision of steel bridge work

 

- Steel work supervision of Ungcheon bridge at Busan New Port

- Steel work supervision of Sinsuro at Sokcho


  

Sonic coring test of cast in place concrete pile

 

- Sonic coring test of ring road at Busan Harbor's pier

- Sonic coring test of bridge construction work field and extension & pavement work of four lane between Saengnim and Samnangjin (Samnangjin bridge) (2002. 03)

- Sonic coring test of cast in place pile of Yangsan Line 1 section extending Busan subway line 2 (2002 ~ 2004)

 


Impedance test and damage inspection of ready made pile depth


- Impedance test and core compression strength of levy building work field at Jisa stream

 


Simbat test of pile bearing capacity test

 

- Simbat test of ring road at Busan Habor's pier

- Simbat test service of PHC pile of SK VIEW apt. at Hadan

- Simbat test of bridge construction work field and extension & pavement work of four lane between Saengnim and Samnangjin (Samnangjin Jin bridge) (2002. 03)

- Dynamic loading test of ICD railroad building work field at Yangsan (2002 ~ 2003)


  

Repair·Reinforcement & Maintenance of all kinds of construction

 

- Repair & reinforcement work and inside repair work of construction at Busan branch office (2002. 04)

- Improvement work of toilet at Ganam elementary school (2002. 08)

- Repair & reinforcement work of sheeting temporary construction during building work at Buam dong Tower Vert ville



Physical exploration

 

- Ocean Seismic survey seabed ground at Gamcheon Harbor, multipurpose pier of Busan Harbor (2002. 08)

- Geological survey for safety diagnosis of Jedeok Dong's villa at Jinhae city (GPR, Electrical Resistivity Survey) (2002. 09)

- Geological survey for inspecting dead stone dropping amount at Busan New Port (2002. 08) 

댓글목록

등록된 댓글이 없습니다.

Misung C&S Inspection Co., Ltd.
Address
1351, Nakdongnam-ro, Saha-gu, Busan 604-853, Korea


Tel
82-51-291-2055
Fax
82-51-293-5379
E-mail
misung@mcsco.co.kr
상단으로