Main Performance

Misung C&S Inspection

Technical Service Performance

(Please Click on the title to see all the performance results for the year.)

[2003] Busan new port (Geophysical exploration), Daeyeon high bridge (…

페이지 정보

본문

Physical exploration (Seismic)

 

- Mat depth survey and layer exploration of Mt. Yokmang and seismic exploration of Muangun 3 Lipo breakwater at Busan New Port work field 

  (Donglim Complex Construction Co., Ltd on June 2003)

- Typhoon damage recovery work at Busan New Port 1 section (seismic inspection) (2003. 03)

- Mat depth survey and layer exploration of North harbor Mt. Yokmang at Busan New Port's work field (2003.07)

- Inspection service of ocean seismic survey of seabed ground for multipurpose pier at Busan Port (2003.08 Korea Port Association)

- Seismic fault inspection service of embankment 1 section of dredging soil at Busan New Port (2002, 2003 Korea Port Association)

- Dean stone section exploration and drilling of embankment 1 section of dredging soil at Busan New Port (2002, 2003 Korea Port Association)

 


Construction work (Repair, Reinforcement, Foundation)

 

- Retaining wall reinforcement of construction pole and waterproof work of root at Korean Petroleum Quality Inspection Institute's Yangsan branch office

  (2003.04 Korean Petroleum Quality Inspection Institute)

- Repair work of construction's inside and outside at Korean Petroleum Quality Inspection Institute's Yangsan branch office

  (2003.06 Korean Petroleum Quality Inspection Institute)

- Repair work of Seogok elementary school class (2003.06 Dongnae office of Education in Busan)

- Construction work at Dogam (2003.07 Busan Gijanggun office)

- Repair work of Handok high school (drainage and coating) (2003.08 Handok girls high school)

- Reform work of toilet at Ganam elementary school (2002, 2003 Busan Dongbu Office of Education)

- Building connection repair work of Daeyeon viaduct (2002, 2003 Busan Construction Safety Test office)

- Construction repair, reinforcement and geology reinforcement work at Jedeok country during working of embankment 1 section of dredging soil

   at Busan New Port (2002, 2003 Daerim Industry Co., Ltd)

 

 

Construction field (Precision safety diagnosis, Precision inspection and Defect diagnosis)

 

Precision safety diagnosis service at embarkation hall (Ungbi hall) at Korea Maritime University (2003.01 Korea Maritime University)

- Safety inspection at Seodong church (2003.02 Roman Catholicism Busan parish Seodong church)

- Safety inspection of connecting with store outside at Gijang Hanshin apt. (2003.05 Gi jang Hanshin apt. store prosperity meeting)

Precision safety inspection service of vehicle entry place and coast passenger terminal at Busan Port 

  (2003.03 Busan Port Construction Office of Busan District at Busan Ministry Maritime Affairs and Fisheries)

- Precision inspection at Sfunz construction at Haeundae (2003.05 Sfunz)

- Defect inspection for 5years and exact inspection at Hwaseung apt. at Buam-dong (2003.05 tenant representative meeting)

- Safety diagnosis of steel tower construction at Tongyeong KT (2003.05 KT branch office at Changwon)

- Measuring management and existing construction surrounding field state inspection at Buwon-dong field at Gimhae

  (2003.05 Garak Complex Construction Co.,Ltd)

- Precision diagnosis of Junglim apt. at Geuk-dong (2003.06 tenant representative meeting)

- Defect diagnosis of Hyundai apt. construction at Anrak (2003.07 tenant representative meeting)

Precision inspection and defect inspection at Hwamyeong City Green apt. (2003.07 Mart World Management)

 


Measuring management

 

- Measuring management at Buam viaduct (2002 2003 Yunsung Development Co., Ltd)

- Measuring management of new building field at Buam-dong Tower Vert Ville (2002 2003 Construction Alpome)

- Measurement and construction of bridge measuring establishment during working of embankment 1 section of dredging soil at Busan New Port

  (2003. 01 Daelim Industry Co., Ltd)


 

Engineering

 

- Cast in place pile' SONIC CORING TEST during working of ring road at Busan Port Pier (2section) (2001, 2002, 2003 Kolon Construction Co., Ltd)

- Plate loading test of new building field of Samsung Raemian at Ulsan Yaksa-dong (2002, 2003 Sam Sung Produce Co., Ltd)

- Cast in place pile' SONIC CORING TEST of extending Yangsan line 1 section at Busan subway 2 line (2002, 2003 Hyun Dai Construction Co., Ltd)

- SONIC TEST during cast in place pile working at Nam Port Bridge 1 section construction work field (2002, 2003 Dae Woang E&C)

- SIMBAT TEST of temporary work field and extending & pavement of 4 lane between Saengnim and Samnangjin 

  (2002, 2003 Hyundai Construction Co.,Ltd)

- Property of matter test and core compression strength test during embankment building work of Jisa Stream (2 stage)

  (2002, 2003 Yungdong Construction Co., Ltd)

- Seismic test during embankment building work of Jisa Stream (2 stage) (2002, 2003 Yundong Construction Co., Ltd)

- Continuation wall depth inspection service of Officetel new building work at Haeundae U-dong (2002, 2003 Orum Engineering Co., Ltd)



Bridge and Tunnel field (Precision safety diagnosis, Precision inspection)

 

- Bridge foundation inspection during the others working and embankment section 1 of dredging soil at Busan New Port

  (2003. 01 Daelim Industry Co., Ltd)

- Regular safety inspection of temporary work field of viaduct between Wando and Sinjido (2003 Doosan Construction Co., Ltd)

Precision safety diagnosis at Jaseong viaduct (2002, 2003 Busan City Construction Safety Test Office)

Precision safety diagnosis of construction at Dongcheonbokgae Road (2003. 03 Busan City Busan Jin-gu)

Precision safety at Songjeong tunnel (2003. 02 Busan City Construction Safety Test Office)

- Regular safety inspection of construction work at Yangsan ICD rail (2003 Busan Ministry Maritime Affairs and Fishes (Hanra Construction Co., Ltd))

- Construction safety inspection of promoting work at Saeng Gok garbage reclaimed land (2003 Jindo Complex Construction Co., Ltd)

- Initial Precision inspection service of Sin Su Ro bridge at Sokcho Port (2003 Donghae district Ministry Maritime Affairs and Fishes)

Precision safety diagnosis service of Bokgae construction at Kyeonu main stream (2003 Busan City Busan Jin-gu)

 


Harbor field (Precision safety diagnosis, Precision inspection)

 

Precision safety diagnosis of harbors construction of Doosan Heavy Industry Co., Ltd (2003. 04 Doosan Heavy Industry Co., Ltd)

- Initial inspection service of tourist ship pier at Sokcho port (2003. 05 Donghae District Ministry Maritime Affairs and Fishes)

- Precision safety diagnosis service for recovery of typhoon damage at Busan Port (2003 Busan Korea Container Terminal Authority)

- Design service of HBCT Q/C TIE DOWN (2003 Hutchison Korea Terminals)

- Safety inspection of Harbors construction at Samsung Heavy Industry (2002, 2003 Samsung Heavy Industry)

댓글목록

등록된 댓글이 없습니다.

Misung C&S Inspection Co., Ltd.
Address
1351, Nakdongnam-ro, Saha-gu, Busan 604-853, Korea


Tel
82-51-291-2055
Fax
82-51-293-5379
E-mail
misung@mcsco.co.kr
상단으로